
Every project must have a starting point. With some rough lumber sized to specifications at hand, work in the Mana 24 began. The pre-cut plywood pieces enabled me to go straight to preparatory assembly, adding bearers cut from the planed Douglas Fir to bulkheads, six bulkheads for each hull.

Most of the plywood used for bulkheads has its first coat of epoxy already applied, allowing work to proceed quickly.



The forward section of the keels also has doublers, which were added, and once that was completed, I couldn’t wait any longer. I had to try a dry-fit with bulkheads 2, 3 and 4 set in place on keel. It is starting to take shape, don’t you think?


Leave a Reply