IMG_1750

Every project must have a starting point. With some rough lumber sized to specifications at hand, work in the Mana 24 began. The pre-cut plywood pieces enabled me to go straight to preparatory assembly, adding bearers cut from the planed Douglas Fir to bulkheads, six bulkheads for each hull.

IMG_1814

Most of the plywood used for bulkheads has its first coat of epoxy already applied, allowing work to proceed quickly.

IMG_1817

IMG_1824 With the bulkheads completed I turned my attention to the cabin soles and bunks, adding doublers to the underside of each where required, and then adding the second coat of epoxy also to the underside.

IMG_1842

The forward section of the keels also has doublers, which were added, and once that was completed, I couldn’t wait any longer. I had to try a dry-fit with bulkheads 2, 3 and 4 set in place on keel. It is starting to take shape, don’t you think?

IMG_1844IMG_1843

Advertisements